| |
Even More Progress on the Replacement for Engine 473
January 22nd, 2010
This week, the cab finished on the cab line and the chassis finished on the chassis line to merge with the cab. The pump house was mounted a little later in the day. The body is near finish in paint. Next week, the body should have harnessing and trim added, and along with the water tank, should be mounted to the chassis as it begins on the main assembly line. It is definitely past the half-way point! The final inspection date is set for February 18th.
|
|